The To Do List - Updated!
So exactly one year ago I posted this list of all of the things we want to get done in our house, and I figured a year is long enough to go without an update! So here it is! 
 
Main Floor
 FRONT ENTRANCE (7% complete) 2% increase. So... basically nothing happened here!
FRONT ENTRANCE (7% complete) 2% increase. So... basically nothing happened here!
- make a coat rackWe didn't make one, but I did buy a small one. It gets the job done for now!
- replace tile flooring
- paint a chalkboard wall- wanna see?
- paint all trim
- paint front door
- do something about the mirror
- paint walls and potentially do something fun like this on them
LIVING ROOM (11% complete) 1% increase. Again... nothing
- paint walls white
- furnish the place
- paint the big green monster
- replace all trim
- paint all trim
- replace flooring
- gallery wall- Went from this to this already.
- add artwork to cover up thermostat
- fix the currently too short, awkward curtainsNot fixed, but removed.
- Add blinds/new curtains to windows
- replace ceiling fan
KITCHEN (70% complete) No work done here. The kitchen is fine for now...
- paint all cupboards white
- change hardware
- change counter tops
- paint ceiling white
- paint walls
- board and batten
- refinish hutchhere it is!
- reupholster kitchen chairsall done!
- refinish table and chairs
- new flooring (not happening for a LOOOONG time)
- new trim
STAIRS (20% complete) 15% more than a year ago. This officially the longest project ever.
- remove all carpeting (some of this is done)ALL DONE!
- fix and paint risers
- stain treads
- replace railing and postNOPE! Keeping them, just painting now.
- add a runner (maybe!)
- paint walls and trim up to hallway upstairs
- add artwork
- change light fixture
Second Floor
 MASTER BEDROOM (99% complete) That's a whopping 99% more than last year! (Full update here)
MASTER BEDROOM (99% complete) That's a whopping 99% more than last year! (Full update here)
- paint walls and trim
- fix up and paint closet doors- replaced with curtains instead
- make a jewellery hanging system
- figure out artwork for walls
- refinish and hang mirror- This didn't happen, but dressers were refinished instead.
- curtains
- new lighting
- change flooring
 
MAIN BATHROOM (1% complete) Nope. Nothin' happened here!
- paint everything
- replace tiles in tub/shower area
- replace floor tiles
- new vanity and sink
- new mirror
- towel hooks
- change flooring
- new lighting
- change shower head
OFFICE (3% complete) ummm... I painted a cabinet. High fives all around.
- paint walls and trim
- finish desk
- paint chair
- bookcases
- lighting
- new flooring
- paint filing cabinet
- fix closet doors
SPARE BEDROOM (0 % complete) Yeah, no. This is a storage room at the moment.
- new flooring
- paint walls and trim
- window coverings
- fix closet doors
- figure out what furniture to put in here!
 BASEMENT STUDIO (100% complete) Woot! One more room complete! Except we've made some life changes and this room is in transition again. But at least it's finished!
BASEMENT STUDIO (100% complete) Woot! One more room complete! Except we've made some life changes and this room is in transition again. But at least it's finished!
- build it
- new outlets and electrical work for the room
- replace fuse box with breaker box
- drywall
- sand EVERYTHING
- install flooring
- trim-work
- paint walls and trim
- "brick" wall
- pallet wall
- paint doors
- move some furniture in
 
GUEST BATHROOM (95% complete) Still no new fan cover. I'm calling this one done though.
- paint tile
- replace flooring
- new shelving and mirror
- new shower curtain
- new light fixture
- paint door and trim
- replace fan cover
LAUNDRY ROOM (0 % complete) It's still a scary place.
- paint or replace flooring
- re-do shelving
- plank walls behind washer and dryer
Outdoors
BACKYARD (75% complete) 70% more than last year. And we LOVE it!
- strip deck of all grime
- paint deckLook for post VERY soon!
- power wash all siding and brick
- landscape - move some existing gardens
- create a raised vegetable garden
- create brick walkway from front gate and a patio
- paint front gate
FRONT YARD (10% complete) The garage is no longer baby blue. YAY!
- paint existing concrete front steps
- brick walkway and driveway extension
- paint garage door
- paint front door
- add shutters
- landscape
Alright, so that's it for the list. At this point we're about 38% finished doing everything we want to the house. 28% more than last year, which doesn't seem like a lot, but then I think - we finished 2 full rooms and the backyard is ALMOST finished. That's a lot for a year, right? Sort of? I'm going with yes because after completing the master bedroom in 6 weeks, it feels like we've done a whole lot and after looking back on all the work in the backyard, that almost feels like enough for one year!Do you make lists like this to keep yourself accountable/on track? I'm finding this to be one of the most helpful things ever!